This mission critical project took place during a scheduled 8 week shutdown of the LCLS I experimental tunnel. The purpose of this project was to relocate an existing 12kV duct bank; mechanical, low conductivity, and domestic water lines from a depth of 21’ deep to 6’ below grade, in preparation for the construction of a future drilled tunnel. Work included: Excavation, shoring, and installation of 12kV duct bank, 18” cooling tower water, 10” domestic water, and 2” low conductivity water lines; installation of a pre-cast concrete manhole; coordination of 2 (ea) electrical shutdowns and re-routing of electrical systems in lieu of providing above grade temporary power; installation of fiber optic cable; backfill for future tunnel boring with Control Density Fill; backfill with approved soils; installation of concrete pad and asphalt pathway; restoration of pavement and concrete surfaces; and restoration of landscaped areas.
LCLS II Utilities Relocation – ESP
Contract Value$3.3MProject TypeInfrastructureCore CompetencyDry UtilitiesEarthwork and GradingPavingWet Utilities
-
Stanford Linear Accelerator 1
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/1_slac.JPG -
Stanford Linear Accelerator 2
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/2_slac.JPG -
Stanford Linear Accelerator 3
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/3_slac.JPG -
Stanford Linear Accelerator 4
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/4_slac.JPG -
Stanford Linear Accelerator 5
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/5_slac.JPG -
Stanford Linear Accelerator 6
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/6_slac.JPG -
Stanford Linear Accelerator 7
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/7_slac.JPG -
Stanford Linear Accelerator 8
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/8_slac.JPG -
Stanford Linear Accelerator 9
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/9_slac.JPG -
Stanford Linear Accelerator 10
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/10_slac.JPG -
Stanford Linear Accelerator 11
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/11_slac.JPG -
Stanford Linear Accelerator 12
https://dlineconstructors.com/wp-content/uploads/slideshow-gallery/12_slac.png